|
|
Please login using the form on menu list.
It is required to login for Full-Text PDF.
|
Optimal Cycle Time and Facility Utilization of Production Systems Including Repetitive Process with Set-up Time Modelled by Timed Marked Graphs
Masaki AKAZA
Dong-Ik LEE
Sadatoshi KUMAGAI
Publication
IEICE TRANSACTIONS on Fundamentals of Electronics, Communications and Computer Sciences Vol.E75-A No.10 pp.1385-1393
Publication Date: 1992/10/20
Online ISSN:
Print ISSN: 0916-8508
Type of Manuscript: Special Section PAPER (Special Section on Application of Petri Nets to Concurrent System Design)
Category:
Keyword: Petri net,
scheduling,
strongly connected marked graph,
FMS,
production system,
utilization factor,
set-up times,
repetitive process,
Full Text: PDF(637.7KB)
Summary: A job shop system typically seen in flexible manufacturing systems (FMS) is a system composed of a set of machines and a various kind of jobs processed with the machines. A production system of semiconductor fabrication is an example of job shop systems, which has main features of repetitive processes of one part and set-up times required for machines processing different types of parts. On the other hand, timed Petri nets are used for modelling and analyzing a wide variety of discrete event systems. There are many applications of timed Petri nets to the scheduling problems of job shop systems. The performance evaluation and steady state behaviors are studied by using the maximum cycle time of timed marked graphs. The aim of this paper is to propose a new model for production systems including repetitive processes and set-up time requirements which enables the quantitative analysis of real time system performance. In job shop systems such as a semiconductor fabrication system, it takes considerable amount of set-up time to prepare different types of chemical reactions and the model should take account of a set-up time for each machine. We focus upon the relationship between facility utilization factor and production cycle time in the steady state. In the proposed model, the minimum total set-up time can be attained. Quantitative relationship between utilization factor and production cycle time is derived by using the proposed model. A utilization factor of a system satisfying a given limit of the cycle time is evaluated, and the improvement of the utilization factor is considered. Conversely, we consider the improvement of the cycle time of a system satisfying a given limit of utilization factor.
|
|